Skip to content
Free interactive planning tool

Home Backup Calculator

Estimate battery capacity, inverter output, surge demand, generator size, and possible 240V requirements from your essential appliances.

Editable appliance data Separate running and starting watts Real recharge inputs
Start with a real outage plan

Choose the closest starting profile

A profile fills the calculator with a practical first draft. You can change every appliance, wattage, runtime, and assumption before using the result.

Interactive planning tool

Build your home backup estimate

Use appliance labels or measured values whenever possible. The defaults are editable planning examples, not promises about a specific home.

1 Define the outage
2 Select and adjust loads

0 appliances selectedAdjust quantity, running watts, starting watts, hours per day, voltage, and use pattern.

Essentials 5 planning loads
Heating and cooling 5 planning loads
Water and safety 4 planning loads
Medical and work 3 planning loads
Kitchen and comfort 4 planning loads
3 Set load and battery assumptions
4 Model reliable recharge
Read the result correctly

Five outputs must agree before a system fits

A battery capacity number alone cannot tell you whether a backup system can start a pump, support 240V equipment, recharge during a long outage, or connect safely to a home.

01

Energy capacity

Load energy estimates how many kilowatt-hours your appliances consume. The battery range then accounts for delivery efficiency, reserve, recharge, and the selected planning buffer.

02

Continuous output

This is the power the system should sustain while your chosen loads operate together. Managed mode assumes scheduled and intermittent loads can be sequenced.

03

Starting demand

Motor startup is tested as the other planned loads continue running. The tool assumes one motor starts at a time, which still needs confirmation for the actual equipment.

04

Voltage

A 240V well pump, heat pump, or central air conditioner requires a system and connection that can actually supply 120/240V split-phase power.

05

Recovery

Solar and charging are modeled from array size, sun hours, input limits, losses, charging power, and time. The tool does not use a vague percentage discount.

Transparent methodology

How the calculator works

The formulas are deliberately conservative and visible. They narrow the search; they do not replace an appliance label, electrician, installer, or manufacturer design tool.

Energy during the outage

Continuous: running watts × all outage hours.

Cycling: running watts × outage hours × entered daily duty fraction.

Scheduled or intermittent: entered daily use is counted for each full day, plus up to that amount during a partial day. This avoids cutting an eight-hour CPAP plan to four hours merely because the outage lasts 12 hours.

Battery capacity

The tool subtracts modeled recharge from load energy, but never below an autonomy floor equal to the first 24 hours of selected load, or the complete outage if it is shorter.

Minimum nominal capacity = delivered energy need ÷ AC efficiency ÷ usable battery fraction. The top of the range adds your planning buffer.

Output and startup

Conservative mode adds every selected running load. Managed mode keeps continuous and cycling loads together, then adds the largest scheduled or intermittent load.

For each motor, the tool tests the other planned running loads plus that motor’s starting watts. It reports continuous and surge targets separately.

Generator class

The generator class is the larger of the buffered running target and the starting-demand target, rounded upward to a 500W planning class.

Actual output varies by fuel, model, altitude, temperature, power quality, and receptacle. Confirm both running and starting ratings.

From estimate to equipment

Use the result as a decision gate

Common sizing questions

Home backup calculator FAQ

Why is the battery result shown as a range?

The lower number is the calculated minimum nominal capacity after reserve and efficiency. The upper number adds the selected planning buffer. Actual systems come in fixed sizes, and cold weather, aging, standby draw, uncertain duty cycles, and future loads can all change the practical requirement.

Does the result guarantee runtime?

No. Runtime changes with actual appliance consumption, cycling, weather, battery state of charge, temperature, system losses, and recharge. Treat the result as a planning range and verify it against product documentation and measured household use.

Can ordinary solar panels keep working in an outage?

Not automatically. A grid-tied solar system usually shuts down when the grid fails unless it has the inverter, isolation, controls, and often storage needed for outage operation. The U.S. Department of Energy notes that solar-plus-storage systems can operate without grid support when they are designed to do so.

What if I do not know starting watts?

Use the appliance label, manual, motor data, manufacturer documentation, or a suitable measurement method. Do not assume starting watts equal running watts for a pump, compressor, blower, or other motor load. A qualified installer can confirm hard-start and locked-rotor requirements.

Should every appliance be counted at the same time?

Use conservative mode when you cannot control overlap. Use managed mode only if you will intentionally sequence scheduled and intermittent loads. Automatic load-management equipment can also shed lower-priority circuits, but its design belongs in the installation plan.

Safety and technical references

Planning values last reviewed July 2026. Calculator outputs are estimates and are not electrical, engineering, medical, or installation advice.